An All World Construction LLC resource San Diego County · CSLB 1063936
TubAid

TubAid → All World Construction

Show us the condition.
We’ll help define the next step.

Show the full tub or shower, the visible concern and the surrounding room. Tell us whether the water follows filling, draining or shower use, using observations you already have.

Start with these details

  • A wide view of the full tub or shower and surrounding room.
  • Visible concern, corners, tub edge, threshold and enclosure transitions.
  • Existing access panel or affected area below, if safely accessible.
  • Timing, softness or movement already observed; do not recreate the symptom.
  • Earlier fixture or surround work and the finishes you want to retain.

For conditions requiring an on-site review, the $250 Site Evaluation + Written Bid Package is credited toward the project if approved within 30 days. Hidden damage, access, permits and repair limits are assessed before a construction price is finalized.

Reach the AWC team

619-327-9513

Email your project details

The email opens in your mail app with this website identified in the subject. Include tubaid.com and the symptom in your description. When calling, mention TubAid so we can identify your request.

Call AWC
Email AWC

A request is not a confirmed appointment. For an immediate life-safety emergency, contact emergency services.

What the evaluation should resolve

The reported timing, accessible connections, visible assembly and support concerns, feasible repair limits, finish expectations, and any opening or additional investigation needed to resolve concealed conditions.

Repair work is quoted separately. Any engineering, specialty testing, destructive investigation, permit work or remediation should be identified in the written scope, including exclusions.

Call AWCEmail AWC